Home / Ministry  / The Chennai Airport terminal complex has 13 Aerobridges

The Chennai Airport terminal complex has 13 Aerobridges

1 additional Aerobridge for Code E is under construction and will be operational by March 2024 There have been recent media reports that the airport in Chennai may not get many long-haul widebody international flights for

1 additional Aerobridge for Code E is under construction and will be operational by March 2024

There have been recent media reports that the airport in Chennai may not get many long-haul widebody international flights for lack of aerobridges and other operational limitations. These reports are devoid of facts and accuracy. In this regard it may be noted that

  • The Chennai Airport terminal complex has 13 Aerobridges, and 1 additional Aerobridge for Code E is under construction and will be operational by March 2024.
  • Out of the 13, 5 Aerobridges can cater to Code E aircraft.
  • Once the 2nd phase of T2 is completed in 2025, additional 3 Code E capable aerobridge will be available soon.
  • So, after 2025, 9 No. Aerobridges will be available for Code E aircrafts for International Operations in swing mode.
  • Aircraft A380 mentioned in the news stories is the flagship of Code-F type of aircraft whose production has been stopped since 2021.
  • The new generation wide-bodied long-haul aircrafts A350 and B777 which are being operated and which are being ordered by airlines for future are Code-E type of aircraft and Chennai Airport can handle them.

—–

komal.hospi@gmail.com

Review overview
NO COMMENTS

Sorry, the comment form is closed at this time.