The new terminal building and the airside infrastructures are developed in a total land area of 2534 acres at a cost of ₹1405 Cr. This development includes the construction of Runway, Apron, Parallel Taxi Track, etc. After the new greenfield airport becomes operational, the existing capacity-constrained Rajkot